The project consists of the integral rehabilitation of a building located on Paseo de la Castellana 14 destinated to new offices for public administration . It is intended that rehabilitation in such a unique enclave should not become a referential object but that the character of the environment is maintained. In addition, the protection of the facade and the staircase will favor that the operations carried out in the building are hidden, camouflaged by the facades, except for the small tearing of holes for the access of vehicles in Ayala Street and the specific actions in superior levels of the facades.
An increase of the buildability of 20% is required without increasing the apparent volume and adjusting to the 25 m depth limitations established by the PGOUM. For this reason, the entire service core is reorganized in continuity with a new central courtyard that becomes the spatial and energetic element that activates the whole up to level -1. This solution also allows to use this level below ground as associated space to the main offices, with a business or conference center.
To complete the exterior performance, the roof is reorganized with an orderly and efficient proposal that contains an technical volume, imperceptible from the street at the pedestrian level.
The façade seeks to repair the original appearance so that moldings, friezes and locksmiths are rehabilitated. As for interior finishes, those of value that reinforce the original character of the building are also maintained.
The proposed solution increases the functional options by freeing the entire perimeter of the building. The definitive implantation admits, therefore, many configurations depending on the needs of the user. The central patio also favors the visual and spatial connections between all the floors.
TECHNICAL DETAILS
Year: 2017
Architecture: Estudio Álvarez-Sala, aybarmateos.arquitectos
Developer: Segipsa
Visuals: Estudio Álvarez-Sala