Velázquez 88 Offices

  • Contests
  • Rehabilitation
© Estudio Álvarez-Sala

Currently in cities such as Madrid we find a low amount of free land and a large number of buildings that allow it’s reuse and renovation, usually being this last option the most economical and sustainable choice instead of the construction of a newly designed building.

This is the case of this building, an office building with great potential for improvement and renovation that needs an image appropriate to its emblematic location in the corner of Velázquez st. and Padilla st.

The intervention is focused on the following aspects:

1.A new access from the corner of the two streets is proposed, getting a representative access while keeping facade space available for commercial premises. The access from the street is at the same level as the sidewalk, there are a few steps to increase the representativeness and also not to lose square meters of premises in the semi-basement floors. Accesibility is solved by a ramp located behind the information desk.

2.The treatment of the premises in both streets, that were located in two levels with no direct contact with the street, is directed to get the enabling of the semi-basement floors as an additional ground floor. It is proposed to eliminate the section of floor slab next to the façade, allowing a simultaneous view of the ground floor and the semi-basement floor from the outside and an access from the sidewalk to an intermediate level.

3,The external enclosure system will be replaced, seeking greater transparency towards the street and increasing the dignity of the interior spaces. Different solutions with variations of the sun protection factor are proposed depending on the orientation.

4.The new sectorization makes the floors independent and eliminates the additional halls to access the offices. The new position of vertical pipes and a new system of ceilings and floors allow different compartmentalisations. The relocation of the toilets and the halls is proposed in the most compact way possible around the central communications centre for an optimized use.

5.The roof is rearranged to allow occasional use as a space for recreation or occasional events, taking advantage of its splendid views and limiting the building’s facilities to the central body, delayed from the front.

6.The project considers the coexistence of the framework of the existing air conditioning system with new equipments that allow controlling the heating, refrigeration, ventilation, air curtains and domestic hot water production systems in a centralized way.

TECHNICAL DETAILS

Year: 2017

Architecture: Estudio Álvarez-Sala

Developer: Axiare

Visuals: Estudio Álvarez-Sala